リスク
Are my risks assessed correctly?
Merlin's points and the product of probability and impact often produce different rankings. The AI shows both side by side and checks each probability against risks and issues that have already occurred in the project.
Read all open risks in the current project with probability, the three impacts, points and status. For each risk, also calculate the product of probability and largest impact, and show both rankings side by side. Then check each probability against the project history: are there risks or issues that already occurred in the same project and suggest a higher probability?